sự thi công

/Nhãn:sự thi công

Kirby Kuwait kết thúc năm với sự gặp gỡ của một nhân viên

To conclude a year of achievements, Kirby Building Systems Kuwait organized an employee get-together at Kirby Kuwait Plant. The event, which was attended by over 600 employees, commenced with Sheetal Palkar, Senior Manager – HR, who welcomed all the employees and wished them all the best for the new year. James Minato, Senior General Manager – MEA thanked all the employees for their valuable contributions to the business during 2019. He highlighted the Step Forward survey results, congratulating the teams within

Nhân viên Kirby Kuwait chạy vì từ thiện tại Runq8

For the eighth year in a row, Kirby – Kuwait employees participated in the RUNQ8 charity event, a 5 – 10 km run/walk. The event took place on 23 November 2019 and was a true team building experience for Kirby employees, as more than 63 employees enthusiastically worked together as a team in support of this great cause. The annual event is organized by Fawzia Sultan Healthcare Network (FSHN), with all proceeds from participants going to the Children’s Evaluation and Rehabilitation

Kirby Rak tổ chức sự kiện thể thao thường niên lần thứ 4

Mauris id enim id purus ornare tincidunt. Aenean vel consequat risus. Proin viverra nisi at nisl imperdiet auctor. Donec ornare, est sed tincidunt placerat, sem mi suscipit mi, at varius enim sem at sem. Fusce tempus ex nibh, eget vulputate ligula ornare eget. Nunc facilisis erat at ligula blandit tempor. Mauris iaculis magna ipsum, sit amet pretium risus dictum cursus. Morbi id massa sed risus eleifend rutrum. Mauris lorem diam, fermentum sed lorem ac, maximus efficitur sapien. Aenean condimentum ornare

Kirby Kuwait ra mắt sự kiện thể thao thường niên lần thứ 3

On 3 November 2019, Kirby Kuwait inaugurated its 3rd Annual Sports Meet, gathering all employees for a celebratory launch event. Sheetal Palkar, Senior HR Manager – Kirby Kuwait welcomed everyone to the Meet, outlining the details of the many exciting activities to come. The event was then formally inaugurated by James Minato, Senior General Manager – Kirby MEA, who articulated the importance of maintaining physical fitness and building team spirit on this occasion. Over the course of the next 6 weeks,

Nghiên cứu điển hình VN699: Nhà máy sản xuất mô lớn nhất ở Indonesia

Project Brief After a tough competition, Kirby SEA was chosen to be the supplier for the biggest Tissue Mill in Indonesia due to its diligence done by Design team and Sales team. The broad details of project are as under : Total weight: 1715 MT Location: Indonesia Main contractor: FIBER PAPERTECH ENGINEERING & TRADING LIMITED Pre-qualification Kirby has never worked with FIBER PAPERTECH ENGINEERING & TRADING LIMITED before time. However, Kirby has show its qualification on price and production to compete with other competitors.Completion of supply Design,

Nghiên cứu điển hình VN541: Dự án Mega do Kirby SEA thực hiện

Project Brief In order to meet the demands of Consumer Electronics and PC Peripheral business, Leading Electronics Manufacturing Company from Taiwan has  decided to expand their production facilities in FPIP, Batangas, Philippines. The entire manufacturing facility was built in approx. area of 80,000 SQM with a steel consumption of more than 5000 MT. Pre-qualification Kirby SEA was chosen by the customer due to its unmatched quality and speed of delivery. Even though the Design, Manufacture, Supply and Erection were all challenging but with

Nghiên cứu điển hình VN00454: Tòa nhà TKM 9 Story (Văn phòng Singapore)

Project Brief Customer: TKM Engineering Co., Location: Singapore Total weight: 1858 MT Completion of supply Design, Fabrication and Erection were all challenging and completed in record time well ahead of customers’ expected schedule. Award of project The award of project was done through tendering process. Kirby SEA was awarded the project based and technical capability primarily. Customer delight The customer was very happy after completion of project within the time line as stipulated in the contract. The structure was tested when there was a heavy rain with storm. They