MBAM OneBuild 2026! When: 𝟓–𝟕 𝐀𝐮𝐠𝐮𝐬𝐭 𝟐𝟎𝟐𝟔 Where: 𝐊𝐮𝐚𝐥𝐚 𝐋𝐮𝐦𝐩𝐮𝐫 𝐂𝐨𝐧𝐯𝐞𝐧𝐭𝐢𝐨𝐧 𝐂𝐞𝐧𝐭𝐫𝐞, 𝐌𝐚𝐥𝐚𝐲𝐬𝐢𝐚, Hall 1-2 We are at: 𝐁𝐨𝐨𝐭𝐡 𝟏𝐀𝟕𝟑 We’ve had valuable conversations about Pre-Engineered Building (PEB) and Structural Steel Solutions for warehouses, manufacturing plants, logistics hubs, commercial buildings, and other industrial facilities. It’s encouraging to see the industry’s continued focus on delivering projects faster, smarter, and with greater certainty. If you’re planning your next industrial facility, warehouse, manufacturing
As global industries continue facing logistics disruption, tariff pressures, and manufacturing shifts across Southeast Asia, industrial buildings are being designed with a new priority: resilience. Modern pre-engineered steel buildings (PEB) are no longer just structures for operations; they help businesses adapt faster, scale efficiently, and reduce downtime risks. Key engineering considerations include: • Faster construction timelines • Flexible future expansion • Optimized clear-span layouts • Efficient logistics flow • Scalable operational space From logistics hubs to advanced manufacturing facilities, resilient infrastructure has become an important part of modern
Kirby Southeast Asia proudly participated in the Vietnam Warehousing & Automation Show 2025 (VWAS 2025), held from October 1 – 3, 2025 at the International Centre for Exhibition (I.C.E), Hanoi. At Booth F3, our team presented pre-engineered steel building (PEB) solutions designed for warehousing, logistics, and industrial facilities, highlighting how steel structures deliver strength, speed, and efficiency for Vietnam’s fast-growing logistics sector. Show Highlights Demonstrated the benefits of steel warehouse construction, from large clear spans to quick installation and long-term durability. Connected with logistics, automation, and