On 3 November 2019, Kirby Kuwait inaugurated its 3rd Annual Sports Meet, gathering all employees for a celebratory launch event. Sheetal Palkar, Senior HR Manager – Kirby Kuwait welcomed everyone to the Meet, outlining the details of the many exciting activities to come. The event was then formally inaugurated by James Minato, Senior General Manager – Kirby MEA, who articulated the importance of maintaining physical fitness and building team spirit on this occasion. Over the course of the next 6 weeks,

Kirby Kuwait Merayakan Diwali

On 27 October 2019, Kirby Kuwait celebrated Diwali, the Festival of Lights. On this special occasion, many employees wore traditional clothes, exchanging sweets and holiday greetings.T he Kirby Kuwait Administration Building was decorated with traditional lamps and rows of candles illuminating the corridors. Employees also enjoyed sharing treats as they gathered to light ceremonial Diwali Sparklers. Kirby Kuwait  wishes a Happy Diwali!

Studi Kasus VN699: Pabrik Tissue Terbesar di Indonesia

Project Brief After a tough competition, Kirby SEA was chosen to be the supplier for the biggest Tissue Mill in Indonesia due to its diligence done by Design team and Sales team. The broad details of project are as under : Total weight: 1715 MT Location: Indonesia Main contractor: FIBER PAPERTECH ENGINEERING & TRADING LIMITED Pre-qualification Kirby has never worked with FIBER PAPERTECH ENGINEERING & TRADING LIMITED before time. However, Kirby has show its qualification on price and production to compete with other competitors.Completion of supply Design,

Studi Kasus VN541: Mega proyek yang dilaksanakan oleh Kirby SEA

Project Brief In order to meet the demands of Consumer Electronics and PC Peripheral business, Leading Electronics Manufacturing Company from Taiwan has  decided to expand their production facilities in FPIP, Batangas, Philippines. The entire manufacturing facility was built in approx. area of 80,000 SQM with a steel consumption of more than 5000 MT. Pre-qualification Kirby SEA was chosen by the customer due to its unmatched quality and speed of delivery. Even though the Design, Manufacture, Supply and Erection were all challenging but with

Studi Kasus VN00454: Gedung TKM 9 Lantai (Kantor Singapura)

Project Brief Customer: TKM Engineering Co., Location: Singapore Total weight: 1858 MT Completion of supply Design, Fabrication and Erection were all challenging and completed in record time well ahead of customers’ expected schedule. Award of project The award of project was done through tendering process. Kirby SEA was awarded the project based and technical capability primarily. Customer delight The customer was very happy after completion of project within the time line as stipulated in the contract. The structure was tested when there was a heavy rain with storm. They

Studi Kasus VN707: Pabrik Baja Terkemuka- Proyek Kapal Bendera di Vietnam

Project Brief Total weight: 2577 MT Total Area: 22098 m2 Location: Vietnam Pre-qualification With its advantages over other competitors in optimal and cost effective design, durability and flexibility in expansion and ease in maintenance, Kirby Vietnam has  successfully convinced customer to be their preferred designer, manufacturer and installer for this steel mill project. Completion of supply With total weight of 2577MT and total area 22098m2, this project was also recorded as one of the largest projects in Vietnam. The customer was  very satisfied with the quality, delivery