ケーススタディ

/ケーススタディ

Case Study VN1025: Kirby Vietnam won the logistic warehouse project in Long An province

Project Brief Total weight: 1500 MT Total Area: 37800 sq. m (approx.) Location: Vietnam Main contractor:Newteccons Due to the business expansion of Cainiao Smart Logistics company- a subsidiary of Alibaba group, the owner of this project decided to build the Swan Smart Warehouse Logistics in Long An province  to meet the demands of their customers. The entire facility was built in approx. area of 37800 sqm with a steel consumption of more than 1500 MT. Kirby Vietnam supported customers to be successful in their business by

Case Study VN715: Glass Bottling Plant Project- Philippines

Project Brief Total weight: 1730 MT Total Area: 17,226 sq. m (approx.) Location: Philippines Main contractor: EEI  CORPORATION Pre-qualification This is a very special project with different types of machineries operating at different height levels of mezzanine with heavy point and distributed load . Kirby was chosen to supply Pre- Engineered Steel Building due to its vast experience in designing & execution capabilities of projects. Completion of supply Design, manufacture, Supply and Erection were all challenging and completed in record time well ahead of customers’ expected schedule due

Case Study VN699: The biggest Tissue Mill in Indonesia

Project Brief After a tough competition, Kirby SEA was chosen to be the supplier for the biggest Tissue Mill in Indonesia due to its diligence done by Design team and Sales team. The broad details of project are as under : Total weight: 1715 MT Location: Indonesia Main contractor: FIBER PAPERTECH ENGINEERING & TRADING LIMITED Pre-qualification Kirby has never worked with FIBER PAPERTECH ENGINEERING & TRADING LIMITED before time. However, Kirby has show its qualification on price and production to compete with other competitors.Completion of supply Design,

Case Study VN541: Mega project executed by Kirby SEA

Project Brief In order to meet the demands of Consumer Electronics and PC Peripheral business, Leading Electronics Manufacturing Company from Taiwan has  decided to expand their production facilities in FPIP, Batangas, Philippines. The entire manufacturing facility was built in approx. area of 80,000 SQM with a steel consumption of more than 5000 MT. Pre-qualification Kirby SEA was chosen by the customer due to its unmatched quality and speed of delivery. Even though the Design, Manufacture, Supply and Erection were all challenging but with

Case Study VN00454: TKM 9 Story Building ( Singapore Office)

Project Brief Customer: TKM Engineering Co., Location: Singapore Total weight: 1858 MT Completion of supply Design, Fabrication and Erection were all challenging and completed in record time well ahead of customers’ expected schedule. Award of project The award of project was done through tendering process. Kirby SEA was awarded the project based and technical capability primarily. Customer delight The customer was very happy after completion of project within the time line as stipulated in the contract. The structure was tested when there was a heavy rain with storm. They

Case Study VN707: Leading Steel Mill- The Flag ship project in Vietnam

Project Brief Total weight: 2577 MT Total Area: 22098 m2 Location: Vietnam Pre-qualification With its advantages over other competitors in optimal and cost effective design, durability and flexibility in expansion and ease in maintenance, Kirby Vietnam has  successfully convinced customer to be their preferred designer, manufacturer and installer for this steel mill project. Completion of supply With total weight of 2577MT and total area 22098m2, this project was also recorded as one of the largest projects in Vietnam. The customer was  very satisfied with the quality, delivery