Case Study VN715: Glass Bottling Plant Project- Philippines

Project Brief Total weight: 1730 MT Total Area: 17,226 sq. m (approx.) Location: Philippines Main contractor: EEI  CORPORATION Pre-qualification This is a very special project with different types of machineries operating at different height levels of mezzanine with heavy point and distributed load . Kirby was

Case Study VN541: Mega project executed by Kirby SEA

Project Brief In order to meet the demands of Consumer Electronics and PC Peripheral business, Leading Electronics Manufacturing Company from Taiwan has  decided to expand their production facilities in FPIP, Batangas, Philippines. The entire manufacturing facility was built in approx. area

Case Study VN00454: TKM 9 Story Building ( Singapore Office)

Project Brief Customer: TKM Engineering Co., Location: Singapore Total weight: 1858 MT Completion of supply Design, Fabrication and Erection were all challenging and completed in record time well ahead of customers’ expected schedule. Award of project The award of project was done through tendering process. Kirby SEA